To import a new truck into DR Congo, the importer must follow the pre-export verification programme of the Office Congolais de Controle (OCC) and the Ministry of Commerce. An appointed company verifies the goods before shipment. At the end it issues an Attestation de Verification (AV), which customs need for clearance. Confirm with your clearing agent which company is appointed today.
DR Congo at a glance
| Drive side | Left-hand drive (LHD); traffic keeps right |
|---|---|
| Usual route to Lubumbashi | By sea to Dar es Salaam or Durban, then by road through Zambia and the Kasumbalesa border |
| Usual route to Kinshasa | By sea to the port of Matadi |
| Control body | Office Congolais de Controle (OCC), with the Ministry of Commerce |
| Verification company | Bureau Veritas BIVAC is named in its 2026 datasheet; press reports say the contract may change |
| Key papers | Import declaration (DIB) and Attestation de Verification (AV) |
| Clearance and registration | Handled by the buyer and the clearing agent |
DR Congo drives on the right, so order a left-hand drive truck. The drive side by country table shows the side for each market. Buyers in Lubumbashi, Likasi and Kolwezi often receive trucks by road from Dar es Salaam or Durban. Western buyers usually use Matadi.
How the verification programme works
The importer starts the process, not the exporter. The importer opens an import declaration, known as the DIB, at a bank. This is done through the GUICE single window. The DIB needs a detailed pro forma invoice with the value and customs class of the goods. It also needs the contact details of the exporter. The OCC then passes the verification request to the appointed company.
Does it cover new trucks?
The Bureau Veritas datasheet says the programme covers all goods except listed exemptions. It shows no separate procedure for vehicles. It says vehicles must meet safety, build and roadworthiness rules. They must also enter with papers that prove ownership and age. The sources do not say which vehicle papers apply to a new truck. Ask your clearing agent before the truck is built.
General steps before shipment
- The importer registers the DIB at a bank through GUICE.
- The exporter fills in a Request for Information form and sends conformity documents and test reports.
- The truck is inspected in the exporting country, and test reports are reviewed.
- If all is in order, a Preliminary Notification is issued. If not, a Non-Conformity Statement is issued and the goods must not ship.
- After loading, the exporter sends the final invoice, the bill of lading and the packing list.
- The final review gives an AV for customs clearance, or a refusal notice (ARA).
Documents to prepare
- Pro forma and final commercial invoice, with FOB, freight and insurance shown apart.
- Packing list and bill of lading.
- A specification sheet with the model, body type, drive side and engine emission level.
- Chassis number (VIN) list, photos and year of manufacture.
- Test or inspection reports and any vehicle papers the inspection company requests.
What the factory provides
The CLW factory is in Suizhou, Hubei, China. You can inspect the truck at the factory, by live video, or through a third party such as SGS or BV. The buyer normally pays that fee. Each truck normally ships with its CCC certificate and a product certificate of conformity. When destination customs require it, the factory can also provide a product conformity inspection report. Trucks usually load at Shanghai, Wuhan, Ningbo, Lianyungang, Qingdao, Tianjin or Guangzhou. They travel in containers, on flat racks or as break bulk, and large orders go by RoRo. Either CLW or the buyer can book the shipping. Transit, import clearance and registration in DR Congo are the job of the buyer.
What to confirm with your clearing agent
Rules change. Before you order, confirm the current process with your clearing agent and the inspection body.
- Which company holds the verification contract on your shipping date.
- Which vehicle papers apply to a new truck.
- Whether tankers, cranes or other special bodies need extra checks.
- Current charges, document validity and what happens if a step is missed.
- Transit papers for the Dar es Salaam or Durban route, and for Zambia.
- Import duty, registration and any emission or fuel rule. The guide to choosing a Euro engine level explains the fuel side.
Trucks that suit Katanga mines and roads
These trucks come in left-hand drive. DR Congo has no country page yet, so see the pages for trucks for sale in Zambia and mining trucks for the Zambia Copperbelt. You can also browse tipper trucks, water bowsers and fuel tankers.
- Shacman F3000 8x4 Mining Tipper, WP12 400HP, 30 Ton Rated Load: ore and waste haulage on mine roads.
- Sinotruk HOWO 8x4 Tipper Truck, Weichai WP10 or WP12, Heavy Duty: heavy quarry and mine work.
- Foton Auman 6x4 Mining Tipper Truck, 336HP Weichai, 25-30 Ton: smaller pits and road building.
- Shacman H3000 6x4 Water Bowser, 20,000 Litre Tank, 340HP: dust control on haul roads.
- Sinotruk HOWO 8x4 Fuel Tanker 30 m3 with Refuelling Pump, 32 t GVW: bulk diesel for mine fleets.
- Sinotruk HOWO 6x6 Off-Road Cargo Truck, 504 HP, 12.7 t Payload: supplies on rough roads in the rainy season.
- HOWO 6x4 Cargo Truck with 6.3 t Telescopic Crane, 340 hp: lifting parts and materials on site.
For the whole process from order to arrival, read importing a new truck from China. When you are ready, see how to buy.





